How to Read a First Article Inspection Report

A first article inspection report is the first document that tells you whether a supplier can actually make your part. Most buyers read the pass column and stop. The evidence is in the columns beside it.

What has to be on the cover

  • Drawing revision and CAD model revision, with the issue date of each
  • Part number, serial number, and the material heat or lot
  • Every process and sub-tier supplier — heat treat, plating, anodising
  • Inspection environment and the instrument used for each feature

If the drawing revision on the report does not match the drawing you issued, stop. Everything after that page describes a different part.

The four columns that carry the evidence

Every ballooned feature should show nominal, tolerance, actual and deviation. A “pass” with no number is an opinion, not a measurement. Read the actual against the band, not just inside it: a ±0.005 mm bore reported as 0.005 is sitting on the limit, and the next part may fall outside.

Uncertainty is the number nobody prints

A CMM with 1.8 µm stated uncertainty measuring a ±0.005 mm tolerance consumes 36% of the band before the part is touched. If the report omits uncertainty, a marginal reading cannot be interpreted. Ask for the figure, and ask whether the CMM was checked against a calibrated sphere on the day of inspection.

Surface finish and material

Ra is measured with a stylus over a stated cut-off length; “Ra 0.4” without a cut-off is not comparable to another lab’s number. Material certificates should be mill certificates traceable to the heat number marked on the part, not a generic data sheet. If the part is heat treated, the certificate must show the actual cycle, not the specification range.

Four questions before you sign

  • Does the drawing revision on the report match the one I issued?
  • Is every critical feature reported as a number, not a pass mark?
  • What is the measurement uncertainty, and how much tolerance does it consume?
  • Were any features not measured — and why?

A supplier who answers all four without hesitating is telling you something more useful than any certificate on the wall.

What we send

For a new part we balloon every feature, measure on a bridge CMM in a 20 ±2 °C room, and report nominal, tolerance, actual, deviation and the stated uncertainty, with material and finish certificates attached. For production, fit-critical dimensions get 100% outgoing inspection and the sample plan ships with the parts.